BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 17, 2026

Site work and paving for a road / highway in Milltown, Wisconsin. Completed plans call for site work for a road / highway; road / highway; and road / highway.

The projects consist of the following roadwork: 1. 190th Ave. from 191st Ave. to 130th St. (5,420' x 22'): Pulverize existing asphalt and knock down. Fine grade base course to drain, water, and compact. Pave with 2.5" average compacted depth hot mix asphalt and provide 2' driveway kickouts. 2. 170th St. from 190th Ave to 200 Ave. (5,299' x 22'): Pulverize existing asphalt and knockdown. Fine grade base course to drain, water, and compact. Pave with 2.5" average compacted depth hot mix asphalt and provide 2' driveway kickouts. 3. 188th Ave. from 145th St. to 18th Ave. (4,459' x 20'): Fine grade base course to drain, water, and compact. Pave with 2.5" average compacted depth asphalt in one lift and provide 2' driveway kickouts. The Town of Milltown reserves the right to reject any and all bids and to waive any informality in the bidding process or accept bids which best serve the interest of the town. Proof of insurance is required. For any questions or details, contact the Maintenance Supervisor.

Post-Bid

Roads / Highways

$600,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
1
Bidding Soon
847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2026

April 2, 2026

Project location map

To be determined, Milltown, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.