BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Site work and paving for a civil project in Saint-Philibert, Quebec. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; and bridge / tunnel.

Reference number: 20120145 Deadline for receipt of complaints 2026-02-16 There is provision for a tendering process for each tender no Expected duration of the contract without options (in months) 6 Description The Municipality of Saint-Côme-Linière and Loignon Champ-Carr Inc. wish to receive tenders for the repair and extension of drinking water, sewerage and road infrastructure on 5th Street and along Route 173 and on lot 6 550 948. The work includes, but is not limited to: - 5e rue sector o Repair of drinking water, sewer and road infrastructure over +-205 m; o Driving a steel sleeve and inserting a pipe over +- 55 m - Route 173 sector o Extension of a drinking water pipe along Route 173 over +- 115 m; o Extension of a sanitary sewer along Route 173 over +- 75 m; o Directional drilling for sewer and water pipes over +- 105 m. - Residential development sector on lot 6 550 948 o Extension of a drinking water pipe, sewers and roads over +- 825m; o Directional drilling for sewer and water pipes over +- 110m; o Installation of culverts; o Construction of a permanent retention basin. Delivery schedule The contractor must commence work as soon as they receive authorization from the project owner. The contractor must carry out the work without interruption and with diligence, and provide a sufficient number of teams to ensure that all work is completed within nineteen (19) weeks. The contractor may not claim any additional time due to adverse weather conditions. Please note that this project requires a road permit from the Quebec Ministry of Transport and Sustainable Mobility (MTMD). Please note that this project requires a certificate of authorization from the MELCCFP, which is currently in progress. No work may be carried out until this has been obtained. The culverts must be installed between 15 June and 15 September. In order to meet the deadline, the contractor must provide at least two (2) pipe installation teams. In addition, the work must be completed in its entirety before 1 September 2026.

Award

Bridges / Tunnels

$3,194,392.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

June 15, 2026

Project location map

Multiple Locations, Saint-Philibert, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.