Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 31, 2026 at 8:00 PM
Updated April 1, 2026
Site work for a water / sewer project in Marysville, California. Working plans call for site work for a water / sewer project.
“The owner has selected a Construction Manager. https://www.sacbee.com/news/local/article315088539.html $100M Yuba River ‘fishway’ advances amid powerhouse clean-up, angler concerns By Jake Goodrick Updated March 19, 2026 1:45 PM Gift Article The Yuba River flows south of the Englebright Dam on Thursday, May 8, 2025. A “fishway” that is proposed at a smaller dam 10 miles downstream would allow more salmon to return to the area to spawn, but could also give predatory fish increased access. HECTOR AMEZCUA hamezcua@sacbee.com Key Takeaways AI-generated summary reviewed by our newsroom. Yuba Water Agency directors moved forward with the construction of a $100 million-plus project on the lower Yuba River intended to forge passage for fish to swim freely around a small dam. But anglers who revere the 10-mile stretch of protected water upstream of that site still fear the consequences of creating a path for all species, including predators, to reach the fishery that currently only trout and salmon can access. Water agency directors on Tuesday chose Sacramento firm Teichert Construction to oversee the project, and approved about $1.4 million for the company to finish designs and begin pre-construction, which officials have said may begin by the end of this year. The water agency, California Department of Fish and Wildlife and National Marine Fisheries Service have partnered for years to build a “nature-like fishway” that bypasses Daguerre Point Dam, a sediment dam northeast of Marysville on the lower Yuba River. Fish ladders currently straddle each side of the dam, serving a step system for the salmon and trout to jump over the dam and reach the upstream water that hits a dead-end at the foot of Englebright Dam. Read more at: https://www.sacbee.com/news/local/article315088539.html#storylink=cpy ------------------------------------------------ CMAR for Daguerre Point Nature-like Fishway If you will attend the Mandatory Informational Conference and Site Walk, RSVP by sending an email to purchasing@yubawater.org and include a signed NDA. A signed NDA is required to attend. Max (3) three attendees per vendor can attend due to site restrictions. Please refer to the RFP documents for PPE required as well. This project is a unique opportunity. Submit any questions to the email purchasing@yubawater.org Project Costs are expected to exceed $60 million, inclusive of pre-construction and construction services to be provided by the selected CMAR entity. Please refer to Attachment 2 to this RFP for a detailed Scope of Work for this Project. Question Deadline: Proposer may submit questions about the RFP, Proposal Documents, addenda, etc. to the Owner's Project Team (OPT) Coordinator by email: purchasing@yubawater.org. All inquiries must be received no later than February 4, 2026, at 3PM PST.
Pre-Construction/Negotiated
Water / Sewer
$60,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
20
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2026
July 1, 2026
To be determined, Marysville, CA
Related To This Project
Marysville, CA
--
Marysville, CA
Bid Date: Jan 15 2026
Marysville, CA
Bid Date: Jan 29 2026
Marysville, CA
Bid Date: Jan 13 2026
Marysville, CA
Bid Date: Jan 02 2026
Marysville, CA
Bid Date: Jan 14 2026
Marysville, CA
Bid Date: Dec 17 2025
Marysville, CA
Bid Date: Dec 05 2025
Marysville, CA
Bid Date: Nov 14 2025
Marysville, CA
Bid Date: Nov 18 2025
Marysville, CA
--
Marysville, CA
Bid Date: Oct 06 2025
Marysville, CA
Bid Date: Sep 29 2025
Marysville, CA
Bid Date: Nov 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
