Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 2, 2026 at 7:00 PM
Updated February 3, 2026
Site work for a water / sewer project in Maxwell, Texas. Completed plans call for site work for a water / sewer project.
Approximately 11,000 linear feet of new 16" water main with Union Pacific Railroad Bore. The conclusions and recommendations contained in this report are based on our site visits to the project site and on the soil samples gathered from two borings (W-1 and W-2) performed by BEA on December 23, 2024. The borings were drilled along or within the proposed utility alignment and extended to a termination depth of approximately 10 feet below the existing ground surface elevations. We were requested to drill at two (2) locations deemed accessible to our truck-mounted drilling rig. This report presents the results of our subsurface exploration and engineering analysis for the proposed waterline alignment along the Union Pacific Railroad in Maxwell, Texas. The improvements extend a total of approximately 9,000 lineal feet from Railroad Street to approximately Jolly Road and then south along Cistern Road to Highway 142. The approximate site location is shown on the Site Vicinity Map provided in the Appendix. Based on the limited details made available to us during preparation of our report, the proposed project consists of the installation of a 16-inch waterline for Maxwell SUD. It is our understanding that the alignment is to extend from the intersection of the UPRR and Railroad Street to the intersection of Cistern Road and Highway 142. It is our understanding the project will include cut-and-cover excavation, so no trenchless excavation is anticipated at this time. This item shall govern the furnishing of all materials, equipment, incidentals and completion of all construction required to install complete and ready for operation all valves and appurtenances as shown in the Drawings and specified herein or as directed by the Engineer. The equipment shall include, but not be limited to, the following: 1. Check Valves 2. Gate Valves 3. Butterfly Valves 4. Ball Valves 5. Altitude Valves 6. Valve Boxes and Vaults
Sub-Bidding
Water / Sewer
$2,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
April 20, 2026
To be determined, Maxwell, TX
Related To This Project
Maxwell, TX
Bid Date: May 28 2026
Maxwell, TX
Bid Date: May 19 2026
Maxwell, TX
--
Maxwell, TX
Bid Date: Aug 07 2025
Maxwell, TX
Bid Date: Oct 16 2024
Maxwell, TX
--
Maxwell, TX
--
Maxwell, TX
Bid Date: Mar 11 2024
Maxwell, TX
--
Maxwell, TX
Bid Date: Oct 06 2023
Maxwell, TX
Bid Date: Sep 15 2021
Maxwell, TX
Bid Date: Oct 26 2023
Maxwell, TX
Bid Date: Sep 08 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
