BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Site work and paving for a mixed-use development in Sterling, Illinois. Completed plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.

The work includes reconstruction over two years in two phases. Phase 1 involves installing 2,200 linear feet of storm sewer (12-inch to 24-inch RCP pipe), 32 storm structures, 2,400 tons of asphalt paving, 7,000 tons of base course, 4,800 linear feet of concrete curb and gutter, and 29,300 square feet of concrete sidewalk and driveways. Phase 2 involves installing 2,500 linear feet of storm sewer (12-inch to 36-inch RCP pipe), 44 storm structures, 3,800 tons of asphalt paving, 10,800 tons of base course, 7,300 linear feet of concrete curb and gutter, and 33,500 square feet of concrete sidewalk and driveways. Bids must include a bid security of 10% of the maximum bid price. Bidders must comply with all laws regarding employment, prevailing wages, and, during excessive unemployment, at least 90% of the workforce must be Illinois residents. Subcontractors must comply with these laws as well. The City reserves the right to reject any or all bids, waive any technicalities, and accept any bid deemed advantageous. Bids must remain valid for 85 days and will be awarded to the lowest responsive and responsible bidder. For additional requirements on bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders in the Bidding Documents. Question Deadline 02/04/2026 All requests for interpretation must be received at least five business days prior to the day set for receiving Bids. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing.

Award

Water / Sewer

$4,692,470.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

April 13, 2026

Project location map

Griswold Ave, Sterling, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.