Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 28, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a bridge / tunnel in Memphis, Tennessee. Working plans call for site work for a bridge / tunnel.
"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. Magnitude of Construction: Between $25,000,000 and $100,000,000. The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and land side approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2. Options shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. A Project Labor Agreement (PLA) will be required. Magnitude of Construction: Between $25,000,000 and $100,000,000. Prospective offerors should submit questions concerning this Request for Proposal via Bidder Inquiry in ProjNet *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Bridges / Tunnels
$100,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
October 28, 2026
2915 Riverport Rd, Memphis, TN
Related To This Project
Memphis, TN
Bid Date: Feb 17 2026
Memphis, TN
Bid Date: Feb 24 2026
Memphis, TN
Bid Date: Feb 10 2026
Memphis, TN
Bid Date: Feb 25 2026
Memphis, TN
Bid Date: Mar 10 2026
Memphis, TN
Bid Date: Mar 17 2026
Memphis, TN
Bid Date: Mar 10 2026
Memphis, TN
Bid Date: Feb 24 2026
Memphis, TN
Bid Date: Feb 03 2026
Memphis, TN
Bid Date: Feb 03 2026
Memphis, TN
Bid Date: Mar 11 2026
Memphis, TN
Bid Date: Feb 10 2026
Memphis, TN
Bid Date: Feb 17 2026
Memphis, TN
Bid Date: Feb 10 2026
Memphis, TN
Bid Date: Feb 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
