BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Streamwood, Illinois. Completed plans call for the renovation of a educational facility.

The scope of work for the project at Tefft Middle School includes Removal and disposal of asbestos containing duct insulation and hard fittings associated with fiberglass pipe insulation as identified on drawing ASB-01 and itemized as follows: Duct insulation and hard fittings associated with fiberglass pipe insulation in the second floor and mezzanine of Storage Rooms G202 and G204. Abatement contractor shall utilize gross removal methods. Cleanup of duct insulation debris and removal of hard fittings associated with fiberglass pipe insulation in Fan Room 277. Abatement contractor shall remove and dispose of air handling units and ductwork in their entirety. Abatement contractor shall utilize gross removal methods. Disconnection of the air handling units to be performed by others. Question Deadline 03/13/2026 at 1:00 PM CT Every request for an interpretation shall be made through Online. School District U-46 is accepting bids for the TEFFT MIDDLE SCHOOL HVAC REPLACEMENT Abatement , U-46 Project No. 532-26. Intent to Bid by Mar 20, 2026 1:00 PM CDT.

Award

Educational

$145,200.00

Public - City

Renovation

5

7

2

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
350
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

May 26, 2026

Project location map

1100 Shirley Ave, Streamwood, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.