BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Ontelaunee Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel.

The project is the Berks Road Bridge Replacement over Tributary to Plum Creek. Sealed bids are solicited from qualified bidders for the replacement work. The County of Berks reserves the right to reject any or all bids or any part thereof and/or waive any informality in any bid received when such action is in the best interest of the County. Each bid must be accompanied by bid security in the specified amount and form. Bidders may obtain the package either by downloading it from the County's website or by calling the County's Purchasing Department. All requests for clarifications must be in writing and received by the County of Berks by 5:00 PM on March 10 th , 2026. All clarifications, modifications and corrections to the Bid Documents shall be issued in the form of Addenda and shall be forwarded to all known Bidders. ummary This project consists of the removal and replacement of the existing Berks Road bridge that carries Berks Road over an unnamed tributary to Plum Creek. The existing structure is to be replaced with a culvert, additional approach roadway work to be included as a part of this project. The bridge is located in and owned by Berks County. The following is included as part of this contract: • The scope of work at this location consists of the removal of the existing bridge and replacement with a cast in-place culvert. A temporary stream crossing upstream of the work site will be utilized to provide alternative access during construction. Roadway approach work including the installation of guide rail will also be performed. Access to Camp Joy must be maintained at all times. Property owners must be notified prior to any work to be done on their property to coordinate necessary access requirements. The County shall be notified prior to any coordination with property owners and copied on all correspondence. All requests for clarifications must be in writing and received by the County of Berks by 5:00 PM on March 18, 2026

Bid Results

Bridges / Tunnels

$722,890.00

Public - County

Demolition, New Construction, Paving, Site Work

45

7

20

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 1, 2026

Project location map

Berks Rd, Ontelaunee Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.