Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 3, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Rockton, Illinois. Conceptual plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.
The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 28, 2026, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required to provide for construction contract 64E09, removal and replacement of the structure carrying IL75 over the Rock River south of Rockton. The following structure is included in this project: Existing S.N. 101-0109: IL75 over the Rock River Proposed S.N. 101-0230: IL75 over the Rock River The Consultant must provide sufficient staff to perform all engineering services required to complete the project in accordance with departmental guidelines. This may include, but is not limited to all on-site construction inspection, documentation of pay quantities and related forms for record keeping, Construction & Materials Management System (CMMS) documentation, onsite Quality Assurance material testing, night-time inspection as needed, verification of construction layout including GPS work for layout and documentation, As-Built Survey, submittal of pay estimates, change orders, and all other work required to complete the project in a timely manner. The Consultant will be responsible to ensure contractors complete the work in accordance with the plans and specifications. It is anticipated the department will do all off-site material inspection for the project, and the Consultant will do all on-site material inspection and documentation, including CMMS Materials documentation and PCC Quality Assurance testing as needed. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 033 - RFQ Engineering - Removal and Replacement of Structure Carrying IL 75 Over the Rock River Near Rockton
Conceptual
Bridges / Tunnels
$4,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2027
IL-75, Rockton, IL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
