Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Hoffman Estates, Illinois. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
(2.03-Mile) The project includes widening and reconstruction of Barrington Road to provide two lanes in each direction separated by a median from Mundhank Road to IL 62, replacing the Poplar Creek box culvert, modernizing and replacing traffic signals, interconnection, sidewalk and shared-use paths, ADA improvements, landscaping. The project is located on Barrington Road from Central Road to IL 62 (Algonquin Road). Region 1 District 1 Federal Project # NHPP6C4R(185) County(s) Cook Key Route(s) FAP 362 Marked Route(s): Barrington Road Section(s) 2019-161-W Project No- 1-78074-1000, Questions not accepted as of April 14, 2026 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 03, 2026. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 001 - Widening and Reconstruction of Barrington Road, Culvert, Traffic Signals, Interconnection, Sidewalk and Shared-Use Paths, ADA Improvements
Bid Results
Roads / Highways
$31,680,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2026
June 23, 2026
Barrington Rd, Hoffman Estates, IL
Related To This Project
Hoffman Estates, IL
Bid Date: Feb 02 2026
Hoffman Estates, IL
Bid Date: Mar 30 2026
Hoffman Estates, IL
Bid Date: Mar 10 2026
Hoffman Estates, IL
Bid Date: Jul 17 2019
Hoffman Estates, IL
Bid Date: Apr 24 2026
Hoffman Estates, IL
Bid Date: Mar 27 2026
Hoffman Estates, IL
Bid Date: Jun 05 2026
Hoffman Estates, IL
Bid Date: Jun 01 2026
Hoffman Estates, IL
Bid Date: Feb 27 2026
Hoffman Estates, IL
Bid Date: Feb 10 2026
Hoffman Estates, IL
Bid Date: Feb 27 2026
Hoffman Estates, IL
Bid Date: Feb 27 2026
Hoffman Estates, IL
Bid Date: Feb 11 2026
Hoffman Estates, IL
Bid Date: Feb 11 2026
Hoffman Estates, IL
Bid Date: Feb 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
