BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Demolition, site work, paving and new construction of a civil project in Urbana, Illinois. Conceptual plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 29, 2026, at 1:00 PM at the Region Three/District Five Office in Paris. Phase I/II engineering services are required to provide for the preparation of a project report (anticipated to be a categorical exclusion) and final contract plans, specifications, and cost estimates for the 3R bridge replacement, resurfacing and guardrail updates on Cottonwood Rd and I 74 1 mi E of High Cross Rd. This project includes Phase I work which may consist of a Bridge Condition Report; a Structure Report; a set of Type, Size, and Location Plans, preliminary roadway plans for Cottonwood Rd over I 74, as well as, preliminary roadway plans for I 74 and preparing a project report. This work may include data collection, development of alternatives, cost estimates, traffic management analysis, traffic management plans, accident analysis, quantity computations, and other related work items required to produce a project report This project includes Phase II work which may consist of conducting route surveys, land surveys, right of way plat and plan preparation, writing legal descriptions, staking right of way, geometric studies, roadway plans, and any other related work required to complete final plans, 3D Model, special provisions, and estimates The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 045 - RFQ Engineering - I-74 at Cottonwood Rd (Overhead) 1 Mi E of High Cross Rd

Conceptual

Bridges / Tunnels

$4,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
1
Bidding Soon
499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2027

Project location map

I-74 & Cottonwood Rd, Urbana, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.