BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

This is a service / maintenance or supply contract in Eldorado, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 4, 2026, at 10:00 AM at the Region Five/District Nine Office in Carbondale. Phase I/II engineering services are required to provide work associated with the reconstruction of IL 142 from Raleigh Rd. to US 45 in Eldorado. Reconstruction of IL 142 includes pavement replacement, curb & gutter, sidewalk, bicycle accommodations, entrance and sideroad improvements, storm sewer, traffic signals, and pavement markings. Phase I is expected to include the preparation of a Project Report (anticipated to be a categorical exclusion), a location/drainage study, environmental impacts and coordination, data collection, cost estimates, typical sections, and pickup surveys as needed. Phase II is expected to include preparation of contract plans, quantities, specifications, and cost estimates. Included will be roadway plans, typical sections, drainage plans, erosion control plans, pavement marking plans, traffic signal plans, pavement marking plans, cross sections, detailed staging plans and special details. Phase II will also include any ongoing environmental coordination as needed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Special Studies (Location Drainage) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 64 - RFQ - IL 142 From Raleigh Road to US 45 in Eldorado, Phase I/II Project

Conceptual

Roads / Highways

$9,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

Project location map

State Rte 142, Eldorado, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.