BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Renovation of a municipal facility in Buffalo, New York. Completed plans call for the renovation of a municipal facility.

NYSDOL Certificate of Contractor Registration, NYS Vendor Responsibility Form CCA-2 A/B/C, NYSDOL wage rates, MBE/WBE/SDVOB, Apprenticeship program, and Local and Disadvantaged Workforce requirements may apply to this project. Direct all inquiries concerning these documents to: Michael LaValley AIA, LEED AP Trautman Associates 37 Franklin St Suite 100 Buffalo, NY 1420 mlavalley@trautmanassociates.com A final addendum will be issued no later than Friday, February 20,2026. Requests for interpretation or correction (RFI) shall be submitted to the Architect no later than Close of Business local time on Friday, February 13,2026. Pre-Bid Meeting 02/10/2026 at 10:00 AM ET Where an SDVOB, MBE or WBE performs a sales function, which is customarily performed as a distinct and necessary part of the supply process, a credit of twenty-five percent (25%) of the dollar value of the subcontract between the MBE or WBE, the Contractor will be awarded toward the fulfillment of the appropriate goal. Should a bidder conclude that they would be unable to satisfy the SDVOB and/ or the MBE/WBE goal, the bidder shall submit a properly executed applicable Waiver Request Form with their bid proposal. Waivers shall be granted only where the availability of SDVOB's, MBE's and/or WBE's in the market area of the project is less than the respective 6%, 10% and 2% goals General Construction Work , repair / replace materials in -kind with modern equivalents that maintain the overall look of the existing facade including , but not limited to : a . Precast Concrete Panel Removal b . Precast Concrete Panel and Sill Repair C. New Exterior Insulation and Finishing System (EIFS) d . Solid Panel Terracotta Repair e . Lattice Panel Terracotta Removal (or Replacement via Add Alts ) f . New Coping , Insulation , Flashing , Miscellaneous Metals , Steel Lintels , Sealants , etc g . PCB remediation as required to safely complete the demolition Work . Testing Report provided in the Project Manual (Section 013126.01 )

Bid Results

Municipal

$7,187,230.00

Public - County

Renovation

11

13

24

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
4
Bidding Soon
2,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

June 1, 2026

Project location map

25 Delaware Ave, Buffalo, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.