Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 30, 2026 at 8:00 PM
Updated March 31, 2026
Site work for a water / sewer project in Bloomingdale, Georgia. Completed plans call for site work for a water / sewer project.
Questions Due Date: Feb 23rd 2026, 5:00 PM EST Chatham County is soliciting bids from qualified contractors to provide removal and installation of fencing and gate services at the Dillion Landfill facility in accordance with the terms and conditions contained within this bid. The landfill is located near 600 D.O.T Barn Road, Bloomingdale, GA, 31302. . Chatham County is soliciting bids from qualified contractors to provide removal and installation of fencing and gate services at the Dillion Landfill facility in accordance with the terms and conditions contained within this bid. The landfill is located near 600 D.O.T Barn Road Bloomingdale, GA, 31302 Work consists of the removal of approximately 150 feet of existing chain link fence with a double barn gate and the installation of 1,966' feet of new galvanized chain link fence with barbed wire and a 25 feet double access drive gate. Quantities provided are approximates/estimates. The contractor is responsible for visiting the site to verify site conditions and confirm quantities. Bid award will be based on the lowest unit price. Cost shall include all labor, materials, tools and equipment necessary to accomplish the task 1 Removal of existing chain link fence (150 ft) 2 Removal and disposal of existing double gate 3 Installation - 6 Ft, Galvanized chain link fence, 9 gauge; including barbed wire and arms, tension wire, posts, and hardware. 4 Insstallation - 6 Ft, Double access gate, 9-gauge galvanized chain link with locking to accommodate a heavy-duty lock (Master lock #5); including barbed wire and arms, tension wire, posts, and hardware. A. GATE REMOVAL AND FENCE/GATE INSTALLATION: 1. Removal of existing double barn gate and fence between the entrance and the front entrance. The disposal of the fence can be placed in the metal container on site. 2. Install approximately 1966' feet of new 9 gauge 6 feet high chain link fence. o 5/8" Top Rail o SP40 Line Posts Driven 4'deep o SP40Terminal Post 3" deep w/concrete o Tension wire at bottom 3. Install one (1) - 25 feet wide double access drive gate, 9 gauge 6 feet high, constructed with heavy gauge posts, hinges and drop rod for weight. o 4" Gate Post 3' deep w/ concrete o 1-5/8" SP40 gate framing o bull hinges o drop rod ASSY) 4. With locking to accommodate a heavy-duty lock (Master lock #5) The fence and gate shall be constructed with heavy gauge posts, middle rail throughout, bottom tension wire and 3 strand barbed wire arms installed along the front double gate entrance top to deter unauthorized entry. 5. All posts, line posts and top rails shall be schedule 40. The posts shall be on eight (8) feet centers and be set in eight (8) inch holes with concrete to a minimum depth of two (2) feet deep for a finished height of eight (8) feet posts. 6. Field markers will be placed onsite to show the approximate alignment, start and end of the proposed fence. 7. Bid price shall include all labor and ancillary fence parts (such as but not limited All work shall be completed within 120 calendar days Goals established for this project are 30% combined MBE/WBE unless otherwise specified.
Award
Water / Sewer
$57,508.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2026
April 2, 2026
600 D.O.T Barn Rd, Bloomingdale, GA
Related To This Project
Bloomingdale, GA
Bid Date: Feb 26 2026
Bloomingdale, GA
--
Bloomingdale, GA
Bid Date: Aug 27 2025
Bloomingdale, GA
Bid Date: Aug 07 2025
Bloomingdale, GA
--
Bloomingdale, GA
Bid Date: May 12 2025
Bloomingdale, GA
Bid Date: Mar 20 2025
Bloomingdale, GA
Bid Date: Feb 25 2025
Bloomingdale, GA
Bid Date: Dec 04 2024
Bloomingdale, GA
Bid Date: Dec 02 2024
Bloomingdale, GA
Bid Date: Jan 08 2025
Bloomingdale, GA
Bid Date: Dec 04 2024
Bloomingdale, GA
Bid Date: Aug 12 2024
Bloomingdale, GA
--
Bloomingdale, GA
Bid Date: Jan 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
