BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a mixed-use development in Providence, Utah. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

A portion of 100 South in Providence City between SR165 and Gateway Drive exists as a half road and needs to be widened to the full right of way width. This contract will widen the road and construct curb and gutter, park strip, and sidewalk. COmpletion- 30 consecutive calendar days The ENGINEER will stop receiving questions as of February 16th at 5:00 PM. All questions received after this time will not be answered.

Bid Results

Roads / Highways

$118,475.00

Public - City

Paving, Site Work

11

9

4

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 20, 2026

Project location map

100 South Road, Providence, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.