BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Renovation of an educational facility in Edwardsville, Illinois. Completed plans call for the renovation of a educational facility.

https://www.mrt.com/news/article/edwardsville-district-7-board-february-agenda-21631898.php EHS South renovation bids Renovation work at EHS South is also on the agenda for consideration. Advertisement Article continues below this ad During the board’s Feb. 9 work session, administrators reviewed a long-term facilities concept that would relocate district administrative offices to the EHS South building. The idea was first introduced under former Superintendent Dr. Patrick Shelton as part of broader efforts to address aging facilities and rising maintenance needs. The renovation would allow offices currently housed at the Mark Twain I and Mark Twain III buildings to move to EHS South. The district received six bids for the project, with Millennium Construction LLC submitting the lowest responsive base bid at $494,800. Base bids ranged from $494,800 to $779,119. According to the agenda packet, the district currently pays $217,596.12 annually in lease costs for the Mark Twain office space. Mark Twain III offices must be vacated by June 30, 2026, and Mark Twain I offices must be vacated by Sept. 1, 2026. The estimated project budget was between $700,000 and $750,000 and would be paid from the district’s Operations and Maintenance Fund. Rental payments currently come from the Education Fund. Advertisement Article continues below this ad Board members will also consider two alternate bids: $3,100 to install new restroom doors and $12,000 to install carpet tile over existing VCT flooring in designated corridors. If approved, the alternates would add $15,100 to the total project cost. --------------------------- Work includes but is not limited to selective interior demolition of existing lockers, classroom walls, doors/frames, light fixtures, sprinkler heads/piping, ductwork, and Roof Top Unit, to provide new ductwork (including new RTU), sprinkler heads/piping, interior metal stud/gypsum board walls, suspended acoustical tile ceilings and light fixtures to create offices, work areas and conference rooms with new electrical and mechanical system and devices. Bids shall be clearly marked and will not be accepted if faxed, emailed, or received after the stated time. A mandatory Pre-Bid Conference is required for all bidders. Bidders must be properly licensed, able to obtain insurance and bonds required for the Work, and must provide Bid Security in the amount of five percent of the bid amount. No bids may be withdrawn for 60 days after opening. A Performance Bond, separate Labor and Material Payment Bond, and acceptable Insurance will be required of the successful Bidder. Contractors and subcontractors shall pay prevailing wages pursuant to state law. The Board of Education reserves the right to accept or reject any or all bids, waive informality, and award a contract for any part or the whole project.

Award

Educational

$494,800.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
150
Bidding Soon
1,883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 4, 2026

Project location map

6148 Center Grove Road, Edwardsville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.