Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 4, 2026
Site work for a communication facility in Midwest City, Oklahoma. Conceptual plans call for site work for a communication facility.
Construction of a new 500,000-gallon elevated storage tank for Midwest City, including all associated piping, electrical work, controls, and site improvements. Work also includes construction of a new high-service pump station with required shoring and dewatering; installation of approximately 650 linear feet of new 12-inch ductile iron pipe from the new tank access road to an existing connection on Timber Ridge Boulevard; and piping reconfiguration at the existing Titan Tower Tank site with new 18-inch and 16-inch ductile iron pipe, appurtenances, and reconnections. Additional work includes reconfiguration of distribution system piping at 15th Street and Westminster Road, connecting a 24-inch water main on the west side of Westminster Road to a 12-inch main on the north side of 15th Street. Requirements include installation and maintenance of erosion and sediment controls, stormwater permitting and management, isolation valve coordination, and performance of specialized inspections. Tank construction must be completed by manufacturers and installers with at least 10 years of experience, with welding performed per AWWA and AWS standards, foundation design by a licensed structural engineer in Oklahoma, NSF 61-compliant interior coatings, tank mixer, and pumps, and installation of a cathodic protection system per AWWA D106-10. Specialized qualifications include soil condition evaluation prior to foundation placement, proof-rolling, welder performance qualifications, generator installation oversight, and vertical turbine pump startup and testing by a qualified manufacturer's representative. All construction must comply with applicable federal, state, and local requirements. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Communication
$25,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2027
To Be Determined, Midwest City, OK
Related To This Project
Midwest City, OK
Bid Date: Mar 03 2026
Midwest City, OK
Bid Date: Mar 03 2026
Midwest City, OK
Bid Date: Mar 03 2026
Midwest City, OK
Bid Date: Feb 19 2026
Midwest City, OK
Bid Date: Jan 27 2026
Midwest City, OK
Bid Date: Jan 15 2026
Midwest City, OK
Bid Date: Jan 13 2026
Midwest City, OK
Bid Date: Nov 12 2025
Midwest City, OK
Bid Date: Nov 13 2025
Midwest City, OK
Bid Date: Nov 06 2025
Midwest City, OK
Bid Date: Nov 06 2025
Midwest City, OK
Bid Date: Nov 05 2025
Midwest City, OK
Bid Date: Oct 08 2025
Midwest City, OK
Bid Date: Sep 03 2025
Midwest City, OK
Bid Date: Aug 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
