BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work for a communication facility in Midwest City, Oklahoma. Conceptual plans call for site work for a communication facility.

Construction of a new 500,000-gallon elevated storage tank for Midwest City, including all associated piping, electrical work, controls, and site improvements. Work also includes construction of a new high-service pump station with required shoring and dewatering; installation of approximately 650 linear feet of new 12-inch ductile iron pipe from the new tank access road to an existing connection on Timber Ridge Boulevard; and piping reconfiguration at the existing Titan Tower Tank site with new 18-inch and 16-inch ductile iron pipe, appurtenances, and reconnections. Additional work includes reconfiguration of distribution system piping at 15th Street and Westminster Road, connecting a 24-inch water main on the west side of Westminster Road to a 12-inch main on the north side of 15th Street. Requirements include installation and maintenance of erosion and sediment controls, stormwater permitting and management, isolation valve coordination, and performance of specialized inspections. Tank construction must be completed by manufacturers and installers with at least 10 years of experience, with welding performed per AWWA and AWS standards, foundation design by a licensed structural engineer in Oklahoma, NSF 61-compliant interior coatings, tank mixer, and pumps, and installation of a cathodic protection system per AWWA D106-10. Specialized qualifications include soil condition evaluation prior to foundation placement, proof-rolling, welder performance qualifications, generator installation oversight, and vertical turbine pump startup and testing by a qualified manufacturer's representative. All construction must comply with applicable federal, state, and local requirements. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Communication

$25,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
49
Bidding Soon
690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2027

Project location map

To Be Determined, Midwest City, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.