Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 7, 2026
Demolition, site work and new construction of a bridge / tunnel in Livingston, Montana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
The project consists of the construction of a new 110-foot single span bridge on Horse Creek Road over the Shields River, approximately 0.75 miles southeast of Wilsall, Montana. The improvements include removal and disposal of the existing structure, substructure construction, placement of bridge end backfill, hauling and placing riprap, and construction of roadway approaches after the new bridge is complete. The substructure will consist of driven steel H-piles and concrete abutments. The superstructure will consist of prestressed bulb-tee beams with W740 guardrail. Acknowledgment of bidders' satisfaction as to the general, local, and site conditions that may affect cost, progress, and performance of the work is a condition of bidding.
GC Bidding
Bridges / Tunnels
$2,000,000.00
Public - County
Demolition, New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
April 3, 2026
Horse Creek Road over the Shields River approximately 075 miles SE of Wilsall, Livingston, MT
Related To This Project
Livingston, MT
Bid Date: Feb 25 2026
Livingston, MT
Bid Date: Dec 05 2025
Livingston, MT
Bid Date: Nov 12 2025
Livingston, MT
Bid Date: Nov 12 2025
Livingston, MT
--
Livingston, MT
Bid Date: Apr 17 2025
Livingston, MT
Bid Date: Jun 05 2025
Livingston, MT
--
Livingston, MT
--
Livingston, MT
--
Livingston, MT
Bid Date: Mar 06 2025
Livingston, MT
--
Livingston, MT
--
Livingston, MT
--
Livingston, MT
Bid Date: Dec 12 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
