Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Site work and new construction of a fire / police facility in Libertyville, Illinois. Completed plans call for the construction of a 47,076-square-foot fire / police facility.
https://www.dailyherald.com/20260416/construction/libertyville-board-clears-way-for-construction-of-new-32-million-police-station/ Libertyville board clears way for construction of new, $32 million police station ______________________________________ The project consists of a New Construction for the Libertyville Police Station. Approximately 47,076 SF. Trades included but not limited to: Structure Demolition, CIP, Concrete Sealer, Floor Finishes (Epoxy Flooring), Precast Structural Concrete, Masonry, Structural Steel, Metal Fabrications, Rough Carpentry, Sheating, Plastic Laminate-Faced Architectural Cabinets, Dampproofing, Water Repellants, Thermal, Foam & Spray Insulations, Weather Barriers, Air Barriers, Metal Composite Wall Panels, EPDM & PVC Roofing, Firestorpping, Joint Sealants, D/F/H, Access Doors & Frames, Tornado Resistant Coiling Doors, Overhead Coiling Doors, Bullet Resistant Doors & Frames, Section Doors, Aluminum Framed Entrances & Storefronts, Glazed Aluminum Curtain Wall, Security Windows, Glazing, Mirrors, Fire-Rated & Security Glazing, Drywall, Framing, Ceramic & Porcelain Tiling, Acoustical Ceilings, Linear Wood Ceiling Planks, Resilient Base & Accessories & Tile Flooring, Resilient Athletic Flooring, Tile Carpeting, Wall Coverings, Painting, Visual Display Units, Signage, Toilet Compartments, Roof Screens, Wire Mesh Partitions, Wall Protection, Toilet & Bath Accessories, Fire Extinguishers & Cabinets, Metal Lockers, Metal Gun Lockers, Shelving, Flagpoles, Detention Security, Detention Hollow Metal, Appliances & Equipment, Residential Appliances, Evidence Equipment, Firing Range Equipment, Suspended Panel & Plank Ceiling System, Roller Window Shades, Metal & Solid Surface Countertops, Bullet Resistant Fiberglass Panels, Elevators, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Alarm, Site Clearing, Earthmoving, Asphalt Paving, Concrete Paving, Metal Fences & Gates, Soil Preparation, Landscaping, & Site Utilities. QA deadline/Final Requests for Information (RFI) Due - March 10, 2026 as per Addendum 3
Award
Fire / Police
$31,955,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2026
June 1, 2026
200 E Cook Ave, Libertyville, IL
Related To This Project
Libertyville, IL
Bid Date: Mar 06 2026
Libertyville, IL
Bid Date: Feb 10 2026
Libertyville, IL
Bid Date: Feb 25 2026
Libertyville, IL
Bid Date: Feb 25 2026
Libertyville, IL
Bid Date: Feb 25 2026
Libertyville, IL
Bid Date: Mar 05 2026
Libertyville, IL
Bid Date: Mar 05 2026
Libertyville, IL
Bid Date: Mar 10 2026
Libertyville, IL
Bid Date: Jan 16 2026
Libertyville, IL
Bid Date: Jan 30 2026
Libertyville, IL
--
Libertyville, IL
Bid Date: Jan 26 2026
Libertyville, IL
Bid Date: Jan 08 2026
Libertyville, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
