BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Riner, Virginia. Completed plans call for the renovation of a 81,468-square-foot, one-story above grade educational facility.

Rooftop unit replacement for Auburn Elementary School as base bid and Alternate #1 for replacing water source heat pump with new heat pumps, replace all valves and hydronic specialties, and provide testing, adjusting and balancing for all new heat pumps. ADDRESS ALL INQUIRIES AND CORRESPONDENCE TO: Jordan Stump, CPPB Supervisor of Purchasing E-MAIL ADDRESS: jordanstump@mcps.org TELEPHONE NUMBER (540) 382-5100 Ext. 1013 FAX NUMBER (540) 394-4447 Question Deadline 03/2/2026 5 pm SPECIFICATIONS The Contractor shall provide the following: A. Submit one (1) paper copy of the executed offer to include: a. Executed and signed General Information Form from above; b. Completed Section VI. PRICE SCHEDULE; c. Completed Section VII. ADDENDUM ACKNOWLEDGEMENT, if applicable; d. Ensure Bid Amount includes a $200,000 Contingency Allowance used upon Owner’s Instructions. Unused Allowance funds will be credited to the owner. e. Ensure Bid Amount includes the cost of a Performance Bond and Labor and Materials Bond, each in the amount of 100% of the bid. f. Bid Bond or Bid Guarantee of 5% of the amount of the bid. Bid Bond will be returned after delivery to the Owner of the Performance and Payment Bonds by the accepted Bidder. Summary of Project Description: Scope of Work includes the following: BASE BID: (TO COMMENCE AND BE SUBSTANTIALLY COMPLETE / SCHOOL-READY BY JULY 28, 2026. 1) Replace existing roof-mounted energy recovery ventilators with new dedicated outdoor air units. Remove existing energy recovery ventilators and roof curbs. Install new dedicated outdoor air units and roof curbs. Modify existing supply and return ducts as indicated on the drawings and as required to connect to new equipment. 2) Replace existing hydronic duct heating coils with new heating coils. 3) Replace existing hydronic plate and frame heat exchanger in the condenser water system with a new heat exchanger. 4) All valves and hydronic special ties related to the duct heating coils and heat exchanger shall be replaced with new items. Piping arrangement shall be modified to accommodate the new equipment. 5) Control and monitoring for new and existing HVAC equipment and systems (except equipment included in Bid ALternate #1) shall be provided by a new building automation system provided by Alerton and installed by Hoffman Building Technologies. †Components and wiring of the existing building automation system that are no longer required shall be removed. 6) Provide testing, adjusting, and balancing for all new and existing equipment and systems. †BID ALTERNATE #1 (TO COMMENCE AND BE SUBSTANTIALLY COMPLETE / SCHOOLREADY BY JULY 26, 2027. 1) Replace existing water source heat pumps with new water source heat pumps. 2) All valves and hydronic specialties related to the heat pumps shall be replaced with new items. Piping arrangement and ductwork shall be modified to accommodate the equipment replacement. 3) New heat pumps shall be connected to the new Alerton Building Automation System. Components and wiring of the existing Building Automation System that are no longer required shall be removed. 4) Provide testing, adjusting, and balancing for all new heat pumps. COMMISSIONING: The contractor, including the controls vendor, shall assist the Commissioning Authority retained by the owner with Commissioning including the following items: 1) Provide control drawings and sequence of operations. 2) Assist with functional testing. 3) Make changes and adjustments necessary to correct deficiencies found. † C. Contract Terms: †Lump sum (fixed price, stipulated sum).

Award

Educational

$300,000.00

Public - County

Renovation

38

16

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
80
Bidding Soon
1,114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 20, 2026

Project location map

1760 Auburn School Dr, Riner, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.