BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work and paving for a mixed-use development in Salt Lake City, Utah. Completed plans call for site work for a retail development; road / highway; and for paving for a road / highway.

Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. Remove the existing asphalt pavement located at the back dock and replace with 6" concrete pavement over 6" road base. Remove and replace a section of the adjacent asphalt roadway. Question Deadline 02/17/2026 at 3:00 PM MT All project related requests for information, clarifications, and questions must be submitted to DFCM via website. Sawcut existing asphalt. Remove and dispose of existing wheel stops. Remove and store existing wheel stops. Remove existing asphalt pavement. Remove existing road base/subgrade from below the existing asphalt to 12" below finish grades. Remove existing road base/subgrade from below the existing asphalt to 16" below finish grades. Remove and dispose of existing concrete pad. Over excavate an additional 12" of soft subgrade and fill with pit-run material. Provide and install stabilization fabric. Provide and install new standard curb and gutter with 6" road base. Provide and install 3'- 0" wide concrete waterway with 6" road base. Provide and install 4" thick concrete ramp with 6"road base. Provide and install 6" thick concrete pad with microfibers over 6" road base. Install 12" road base. Install 4" asphalt. Painted 4" wide solid yellow parking stall stripe lines. Painted 1'-0" tall "NO PARKING" stencil letters. Reinstall existing wheel stops. Flush system and clean-out debris from existing and new storm drain catch basins. General Conditions. Contractor's Supervision. Insurances. Payment & Performance Bonds. Project mobilization. Erosion control, sweep, and dust control. Construction survey and staking. Traffic control and pedestrian safety.

Award

Roads / Highways

$111,244.00

Public - State/Provincial

Paving, Site Work

10

14

6

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
0
Bidding Soon
686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

3255 E 3300 S, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.