Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work for a development in Stillwater, Minnesota. Completed plans call for site work for a development.

This project was awarded to Miller Excavating, Inc. in the amount of $506,861.20 Stabilize approximately 1,200 feet of riverbank along the St. Croix River and 750 feet of shoreline along the existing trout pond. Question Deadline 02/16/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered.

Award

Conservation and Development

$506,861.00

Public - City

Site Work

19

18

7

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
107
Bidding Soon
1,659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

1513 Main St N, Stillwater, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed