BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work and new construction of a medical facility in Stillwater, Minnesota. Conceptual plans call for the construction of a 2,500-square-foot medical facility.

The City of Stillwater is planning the construction of a PFAS treatment facility at Well 9, located near the existing water tower on Tower Drive. The facility will use granular activated carbon (GAC) filtration to remove PFAS from drinking water and will include a paved staging area for maintenance and media replacement operations. The proposed building will be situated between the generator building and water tower to optimise process piping and operational efficiency. A variance to reduce the front yard setback from 40 feet to 24.5 feet was approved due to site constraints. Construction is expected to begin in 2026, with the facility operational by late 2026. [7462-3.MetaViewer | PDF] Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.

Conceptual

Medical

$3,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
184
Bidding Soon
1,534
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

Project location map

Northwestern Ave & Tower Dr W, Stillwater, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.