BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 10, 2026

Site work for a bridge / tunnel in Stillwater, Minnesota. Completed plans call for site work for a bridge / tunnel.

The Department of Natural Resources is seeking bids for the labor, equipment, materials, tools, transportation, and incidentals necessary to complete a culvert replacement project on the Gateway State Trail in Washington County to project specifications. Project Details: The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary to: 1. Cut the existing asphalt trail as needed. 2. Excavate as needed and remove the existing culvert. 3. Install a 24" dual wall culvert 42' in length (no F.E.S). Match the existing culvert elevations. Culvert aprons are required for this project. 4. Replace the existing soil and compact. 5. Add Class II gravel to the horse trail to match the existing trail. 6. Add Class V gravel to the paved trail to match the existing trail. 7. Compact and asphalt patch the existing paved trail. 8. Dispose of the old bituminous and culvert and clean up the site. 9. Seed and blanket the area as needed. Question Deadline 01/07/2026 The contact person for questions is: Sue Crapser 320-634-7365 Sue.crapser@state.mn.us

Post-Bid

Bridges / Tunnels

$200,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
137
Bidding Soon
1,523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

February 9, 2026

Project location map

County Road 12 and Gateway State Trail, Stillwater, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.