BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Renovation of a mixed-use development in Boston, Massachusetts. Completed plans call for the renovation of a two-story above grade educational facility.

Estimated Construction Cost: $2,500,000 Schematic Design Fee: $75,000 Final Design Fee: To be Negotiated (max $200,000) Project Type: Renovation All project inquiries shall be directed in writing via email to: Dwayne Veale and Vamshi Thakkallapalli at Dveale@brcps.school and vthakkallapalli@tervacorp.com The renovation of the building is located at 1424 Hyde Park Ave, across the street from the school. The current building on the property will be unoccupied during renovation. Currently the building is configured as residential apartment units and will need to be converted into office and conference room space. The following recommendations and scope of work items were identified; however, it should be noted that this summary may not be the complete representation of the work which will be required to implement the general intent of the work. The work includes but is not limited to: 1. Comprehensive analysis of existing conditions 2. Working with the School, program administrative, office and conferencing needs 3. Develop conceptual designs that align with School needs 4. Project scope should include comprehensive code upgrades required for the building and proposed function 5. Design team to evaluate status of building envelope and propose solutions for any deficiencies 6. All building systems are expected to meet all State and City Energy code and sustainability requirements; Sustainable design is a priority for the school 7. Selected team to develop solutions that align with project budget The work includes all reports, drawings, specifications, and cost estimates required to bid the work. A base project which meets the budget is expected. Due to budgetary constraints, alternates may be required for the project and are included in the work. The design team shall coordinate with the Owner/Owner's OPM to establish a full and updated project budget. MBE at 5.2% and WBE 10.1% and VBE (incl. SDVOBE): 3.0% participation as well as other diversity in its Contract. Work to begin immediately with target completion for construction documents in July of 2026.

Post-Bid

Educational

$2,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
11
Bidding Soon
2,453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

September 1, 2026

Project location map

1424 Hyde Park Ave, Boston, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.