BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and paving for a sidewalk / parking lot in Anchorage, Alaska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This federally funded contract includes all necessary design and construction services as required to construct ADA upgrades and a new ADA-compliant Visual Paging System at Ted Stevens Anchorage International Airport. All work will be completed within the South Terminal, North Terminal, Ground Transportation Lobby, Rental Car Facility access tunnel, and, if included as an authorized enhancement, the Terminal Connector facility. Engineer's Estimate Range: Between $2,500,000 and $5,000,000 AKDOT - RFP D/B - ANC ADA & Visual Paging Upgrades Design-Build An Offeror may direct questions concerning proposal procedures and requirements to Sharon Smith, Central Region Chief of Contracts, P.O. Box 196900 Anchorage, AK 99519-6900 or at email: Sharon.smith@alaska.gov or at Phone: (907) 269-0414. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The following items of work identify the minimum Basic Scope for the project: 1. Visual Paging. a. Design a new visual paging system that is fully compliant with ADA requirements for airport paging systems which maximizes use of existing infrastructure and minimizes the installation of new equipment / infrastructure. b. Upon completion of the design phase, procure and install a new visual paging system in accordance with the approved plans, specifications, codes and standards, and in compliance with the ANC Terminal Construction Standards. c. The ANC ADA and Visual Paging Display layout drawings in conjunction with section 01 00 00 and its referenced documents indicate the existing installed display infrastructure and the basic scope. The DESIGN-BUILDER shall use the basic scope to design a fully functional and integrated system. d. Programming of project network devices into the ANC network are not part of the work of this project and will be performed by ANC IT section. 2. ADA upgrades. Design and construct architectural, plumbing, and electrical modifications as required to upgrade non-compliant building features to ADA compliant features. The included ADA and Visual Paging Display layout drawings, photo reference, and spreadsheet in conjunction with this specification and its referenced documents indicate the existing installed building features and the basic scope

Post-Bid

Sidewalks / Parking Lot

$5,000,000.00

Public - State/Provincial

Paving, Site Work

46

26

4

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
80
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

May 15, 2026

Project location map

5000 W International Airport Rd, Anchorage, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.