Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a fire / police facility in Fort Walton Beach, Florida. Completed plans call for the renovation of a 6,200-square-foot fire / police facility.
**As of April 10, 2026, project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000411494 Question Deadline 02/23/2026 02:30 PM CST Questions are submitted online Yes Purchasing Representative - Direct all inquiries to: Diana Reimer, Purchasing Agent II Purchasing Division, City of Fort Walton Beach 105 Miracle Parkway SW Fort Walton Beach, Florida 32548 Telephone: (850) 833-9523 Fax: (850) 833-9643 Email: dreimer@FWB.org Website: www.BidNetDirect.com Start Date Apr 06, 2026 This Invitation to Bid (Itb) Seeks Responses From Qualified Bidders to Secure a Roofing Contractor to Replace the Tpo Flat Roof, Mansard Metal Roof and Soffit on the City of Fort Walton Beach's Fire Station 7 Located at 1968 Lewis Turner Blvd, Nw, Fort Walton Beach, Fl. This Roof is Approximately 6,200 Square Feet. See Bid Document for Complete Details. General Requirements - Certified Payroll - Insurance Required - License Required - Onsite Maintenance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % SCOPE OF WORK/ TECHNICAL SPECIFICATIONS 5.2.1 There are four (4) separate sections of roof on the Fire Station 7 building. All existing portions of roof shall be removed, down to concrete or wood structure. All roofs will be sloped to drains or toward edge of roofing, so there is no standing water. 5.2.1.2 There is an attached aluminum awning on the Southwest side of building that will have to be detached and reattached to complete roofing replacement. 5.2.2 There is no existing HVAC equipment or skylights on this roof. 5.2.2.1 The Mansard metal roof will need to be removed, and any rotten wood replaced, including plywood siding, fascia and trusses, as needed. 5.2.2.2 The Mansard metal will be replaced with Tuff-rib 26-gauge metal or equivalent and secured with long lasting fasteners. Color Bright Red or equivalent. 5.2.2.3 The soffit is currently made up of plywood and will need to be removed and replaced with ventilated vinyl soffit. Color Black. 5.2.2.4 All exposed wood will need to be wrapped with metal, color matched, to ensure no moisture is accessible. 5.2.3 All work identified in this bid shall be completed by the successful bidder and include all necessary materials, labor, equipment, tools, insurance, permits and fees (if any) needed to complete the specified work. 5.2.4 This building is an active location, and at no times may the Contractor impede or interfere with the access to and from the buildings (walkways or vehicle access points).
Bid Results
Fire / Police
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2026
April 6, 2026
1968 Lewis Turner Blvd, Fort Walton Beach, FL
Related To This Project
Fort Walton Beach, FL
Bid Date: Mar 10 2026
Fort Walton Beach, FL
--
Fort Walton Beach, FL
Bid Date: Apr 22 2026
Fort Walton Beach, FL
Bid Date: Jul 14 2026
Fort Walton Beach, FL
Bid Date: May 13 2026
Fort Walton Beach, FL
Bid Date: Jun 04 2026
Fort Walton Beach, FL
Bid Date: Jun 11 2026
Fort Walton Beach, FL
Bid Date: May 28 2026
Fort Walton Beach, FL
Bid Date: Feb 25 2026
Fort Walton Beach, FL
Bid Date: Mar 03 2026
Fort Walton Beach, FL
Bid Date: Jan 23 2026
Fort Walton Beach, FL
Bid Date: Jan 13 2026
Fort Walton Beach, FL
Bid Date: Jan 15 2026
Fort Walton Beach, FL
Bid Date: Feb 05 2026
Fort Walton Beach, FL
Bid Date: Jan 07 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
