BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work for a water / sewer project in Chesterfield, Virginia. Completed plans call for site work for a water / sewer project.

This project consists of increasing pumping capacity at two pump stations, Chesdin West Pump Station (CWPS) and River Road Pump Station (RRPS). Each pump station will have an increased pumping capacity from 20 MGD to 40 MGD requiring improvements at each station. The improvements to the CWPS include installation of two (2) new pumps, motors, and two (2) new variable frequency drives (VFDs), and adjustments to the station instrumentation and controls. In addition, the existing heating, ventilation, air conditioning (HVAC) system will be upgraded requiring modifications to the existing pump station building façade. The improvements to the RRPS include installation of five (5) new pumps, motors, VFDs, switchboard, and adjustments to the station instrumentation and controls. A building addition is proposed on the northeast corner of the existing pump station building. The building addition will house the new VFDs, and switchboard. The addition will be air-conditioned space. In the exterior of the site, improvements consist of the installation of a 24-in diameter waterline for station bypass, two (2) diesel generators, a diesel fuel tank to supply the generators, and a precast concrete building to house all the equipment (fuel pumps and fuel polishing system) between the generators and fuel storage tank. On request, Owner will conduct a Site visit during Owner’s normal business hours; from 8:30 am to 5:00 pm. Contact Sarah Deitz, PE, at (804) 748-1870 or by email at deitzs@chesterfield.gov. The last day to request a site visit is March 16, 2026. Contractors will be escorted to the site by County personnel and no project questions will be answered. The Work will be substantially completed within 720 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 750 days from the date when the Contract Times commence to run.

GC Bidding

Water / Sewer

$38,000,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
72
Bidding Soon
1,548
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 1, 2026

Project location map

To be determined, Chesterfield, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.