BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a bridge / tunnel in Roseburg, Oregon. Completed plans call for site work for a bridge / tunnel.

The project will have a base bid of for work to be completed on three of the four culverts, located on Eddy Street, Kane Street, and Giles Street. The base bid work generally consists of furnishing all labor, equipment, materials, and supervision for the installation of 80 feet of precast, reinforced concrete three-sided structure, 14 foot span by 7 foot rise, 65 feet of precast, reinforced concrete three-sided structure, 14 foot span by 6 foot rise, 500 feet of 12-inch storm sewer pipe, erosion control, traffic control, temporary water management facilities at each culvert location, 3,000 yards of excavation, 2,250 square feet of concrete block, MSE retaining wall, 3 concrete inlets, 2 Contech Stormfilter catch basins, 1 Contech Stormfilter manhole, backfill, planting and seeding, streambank enhancement, surface restoration, and miscellaneous work as required by the contract. An additive alternate bid consists the installation of a single culvert at Ichabod Street. The alternate bid work generally consists of furnishing all labor, equipment, materials, and supervision for the installation of 40 feet of precast, reinforced concrete three-sided structure, 14 foot span by 6 foot rise, 35 feet of 12-inch storm sewer pipe, erosion control, traffic control, temporary water management facilities at culvert location, 845 yards of excavation, 640 square feet of concrete block, MSE retaining wall, 1 concrete inlets, 1 Contech Stormfilter catch basin, backfill, planting and seeding, streambank enhancement, surface restoration, and miscellaneous work as required by the contract. Technical questions regarding the work to be performed should be addressed to: Erik Ranger, i.e. Engineering, Inc., ranger@ieengineering.com. Competitive Range: $1,550,000 - $1,850,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 04/03/2026

Bid Results

Bridges / Tunnels

$1,234,110.00

Public - City

Site Work

24

9

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
38
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 15, 2026

Project location map

Multiple Locations, Roseburg, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.