BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work for a bridge / tunnel in Huntsville, Texas. Completed plans call for site work for a bridge / tunnel.

Autumn Road Culvert Replacement. The project involves the replacement of an existing 75-inch diameter railroad tank car culvert (an old railcar with ends removed) under Autumn Road, near its intersection with Summer Lane, that carries Spring Lake's outflow. This existing improvised culvert is undersized and misaligned with the downstream creek channel, causing frequent overflow flooding at the Spring Lake Water Plant and severe erosion on downstream properties. The project will design and implement a properly sized concrete box culvert to replace the railcar culvert, aligning it with the downstream channel to improve flow conveyance The primary goal is to mitigate flooding and drainage issues in the Spring Lake area by increasing the capacity of the Autumn Road crossing and improving the efficiency of the drainage channel. Replacing the undersized culvert with a new concrete structure (sized to match the upstream flow and downstream channel) will alleviate flood risk to the water plant and nearby properties and address erosion caused by misaligned flow. This will enhance public safety and infrastructure resilience, and ensure the improvements are longterm and compliant with all state and federal requirements tied to the GLO funding. Question Deadline 02/16/2026 at 5:00 PM CT All questions concerning the RFQ should be directed to the Procurement Manager, Lucy Gonzalez, via email at purchasing@huntsvilletx.gov.

GC Bidding

Bridges / Tunnels

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
207
Bidding Soon
2,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

March 26, 2026

Project location map

Autumn Rd, Huntsville, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.