BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work for a water / sewer project in Truth or Consequences, New Mexico. Completed plans call for site work for a water / sewer project.

Reference Number 0000410451 Question Deadline 03/05/2026 at 2:00 PM MT Questions are submitted online No The project includes the replacement and new installation of waterlines using open trench, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 388 LF of 6-inch C-900-DR-18 PVC pipe, 4,905 LF of 8-inch C-900-DR-18 PVC pipe, 6,721 LF of 12-inch C-900-DR-18 PVC pipe, and 2,997 LF of 14-inch C-900-DR-18 PVC pipe, and an approximately 220 LF of 12-inch C-900 DR-18 FPVC waterlines installed by horizontal directional drilling. The replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement. The project also includes Installation of Five (5) new concrete vault with new PRV's which changes the water system configuration from a two-pressure zone system to a four-pressure zone to control pressure within a 35 to 95 psi design envelope range. All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6' wide by 4' deep trench. (Base Bid includes Sheets CU-228 to CU-243 / CU-244 to CU-267 / CU-270 to CU-273 / CU-628). ADDITIVE ALTERNATE 1: The project includes replacement and new installation of approximately. ,140 LF of 8-inch C-900-DR-18 PVC pipe, 257 LF of 12-inch C-900-DR-18 PVC pipe. The project also included the replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement. The project also includes Installation of two (2) new concrete vault with new PRV's , and one (1) new PRV without concrete vault which changes the water system configuration from a two-pressure zone system to a four-pressure zone to control pressure within a 35 to 95 psi design envelope range. All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6' wide by 4' deep trench. (Additive Alternate 1 Includes Sheets CU-268, and CU-273). ADDITIVE ALTERNATE 2: The project includes replacement and new installation of approximately. 202 LF of 6-inch C-900-DR-18 PVC pipe. The project also the replacement of the new water service lines, service lines, meters, hydrants, connections to the existing system and site work to include roadway asphalt removal and replacement. All the waterline replacements will be 3 to 5 feet parallel to the existing waterlines and new waterline installation with 6' wide by 4' deep trench. (Additive Alternate 2 Includes Sheets CU-269).

GC Bidding

Water / Sewer

$500,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
52
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 20, 2026

Project location map

Multiple Locations, Truth or Consequences, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.