BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2026 at 8:00 PM

Updated March 10, 2026

Site work for a civil project in Blind River, Ontario. Completed plans call for site work for a water / sewer project.

Construction of a raw water intake and low lift pumping station, complete with raw water supply lines to convey raw water from Lake Huron to Martin Street. Every tender shall be accompanied by either an "Agreement to Bond" completed by a surety company lawfully doing business in the Province of Ontario for a Labour and Material Payment Bond for 50% of the Total Tender Price and a Performance Bond for 100% of the Total Tender Price Work must begin as soon as possible after award of contract, no later than April 20th, 2026, with completion date of July 31st, 2027. Council intends to award the project at their March 16th, 2026 regular meeting of Council. The Owner also reserves the right to evaluate the tenders in any manner it deems fit. Question Deadline 02/20/2026 at 5:00 PM ET No such communications are to be directed to anyone other than the Engineer as follows. Chris Kirby, P.Eng, Project Manager TULLOCH Engineering Inc. Email chris.kirby@tulloch.ca The Blind River LLPS site is located approximately on Martin Street in Blind River, Ontario, east of the Wastewater Treatment Plant. We agree that in case all Work called for under the Contract is not finished or completed within the Date of Completion specified aforementioned to or as extended in accordance with subsection GC3.06, Extension of Contract Time, of the General Conditions of Contract a loss or damage will be sustained by the Owner. We agree that the Contractor will pay to the Owner the sum of $1,500.00 as liquidated damages for each and every working day delay to finish the work beyond the date of completion prescribed. We agree that this amount is an estimate of the actual loss or damage to the Owner which will accrue during the period in excess of the prescribed date of completion.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
58
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

April 20, 2026

Project location map

Martin St, Blind River, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.