BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and addition to a transportation facility in Mobile, Alabama. Completed plans call for the addition of a transportation facility.

Question Deadline 03/27/2026 All questions about the meaning or intent of the Contract Documents shall be submitted to the Engineer in writing on. The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for the addition of the Phase V Dock Extension Structure between the South end of the existing APM Container Berth and the North End of the existing McDuffie No 3 berth. The work includes all required demolition and removal of existing marine structures within the Phase V Dock Extension limits of construction and indicated structures in the land area behind the Phase V Dock structure. The Phase V Dock structure will include, but is not limited to, steel pipe z piling, concrete piling, concrete work, crane rail installations, vessel fendering and mooring systems, crane and shore power requirements, electrical distribution, grading, drainage, lighting, and fencing requirements as indicated in the contract drawings and specifications. Bidder attendance at the Pre-Bid Meeting is mandatory. Access to the site for the visit following the meeting will require a TWIC card or Port Access Badge. Bidders without proper access credentials must contact the APA Project Manager at least one week in advance to arrange an escort; same-day escorts will not be provided. All escorted individuals must have valid state or federal identification. All vehicles entering APA properties require proof of registration and insurance. Sealed bid proposals must be delivered per the specified instructions. Faxed or electronically submitted bids will not be accepted. The Alabama Port Authority reserves the right to reject all bids and to waive informalities as necessary.

Post-Bid

Transportation Terminals

$50,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

360

18

36

2

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
62
Bidding Soon
867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

June 8, 2026

Project location map

To be determined, Mobile, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.