Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Demolition and site work for a mixed-use development in Mobile, Alabama. Completed plans call for the demolition of a residential development; for site work for a residential development; and water / sewer project.
** As of February 12, 2026 project has been awarded to AA&A DEMOLITION but no amount available.** Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. Contact the Deputy Director, Gary Jackson, at the City of Mobile, Municipal Enforcement Department, 251.208.1540 phone or e-mail gary.jackson@cityofmobile.org for further clarification regarding this Request for Quotes. A City of Mobile Business License is required and must be current at contract execution and throughout contract period. The Work shall commence with permitting through Build-Mobile within three (3) business days of the date of a written Notice to Proceed. The Contractor shall deliver All Work, proof of Advertisement, Close-out documents and Invoices for completed Work within thirty (30) calendar days from the date of the written Notice to Proceed. A time charge equal to two hundred fifty dollars ($250.00) per calendar day will be made against the Contractor for the entire period that any part of the Work remains uncompleted for more than fifteen (15) calendar days after the time specified for the Substantial Completion of the Work, the amount of which shall be deducted by the Owner, and shall be retained by the Owner out of monies otherwise due the Contractor in the final payment, not as a penalty, but as liquidated damages sustained. The Contractor shall deliver the Work complete within thirty (30) calendar days from the date of the written Notice to Proceed.
Award
Residential Subdivision
$100,000.00
Public - City
Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
March 13, 2026
2419 Brewton Ave, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Feb 26 2026
Mobile, AL
Bid Date: Feb 20 2026
Mobile, AL
Bid Date: Apr 09 2026
Mobile, AL
Bid Date: Apr 09 2026
Mobile, AL
--
Mobile, AL
Bid Date: Feb 04 2026
Mobile, AL
Bid Date: Mar 06 2026
Mobile, AL
--
Mobile, AL
--
Mobile, AL
--
Mobile, AL
Bid Date: Mar 02 2026
Mobile, AL
Bid Date: Mar 03 2026
Mobile, AL
Bid Date: Feb 26 2026
Mobile, AL
Bid Date: Feb 25 2026
Mobile, AL
Bid Date: Mar 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
