Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 10, 2026 at 7:00 PM
Updated February 13, 2026
Demolition and site work for a municipal facility in Miami, Florida. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.
The terms “Building” and “Story” shall be defined as stated in the 2007 edition of the Florida Building Code, as amended from time to time, and does not include residential buildings exceeding two (2) stories in height, or more than 10,000 square feet in total floor area, or commercial buildings. B. The definitions for each of the types of residential buildings are as follows: 1)- “Frame”: any structure with framework and exterior walls made primarily of wood, which does not exceed two (2) stories in height or 10,000 square feet in total floor area. 2)- “Frame/Stucco”: any structure with framework and exterior walls made primarily of wood, with Stucco covering exterior walls which does not exceed two (2) stories in height or 10,000 square feet in total floor area. 3)- “CBS”: any structure with exterior walls primarily constructed of CBS (Concrete Block Stucco) or concrete which does not exceed two (2) stories in height or 10,000 square feet in total floor area. C. The term “Septic tank” shall be defined as provided in the 2004 edition of the Florida Building Code. D. The term “Total Floor Area” shall be defined as the amount of square footage contained within the outer building walls, and shall be determined by measuring the dimensions of the length and width of the building at grade and then multiplying the length times the width of the building (for one-story buildings). For two story buildings the total floor area is the addition of the total floor areas of the first and second floor of the building as follows: the floor area for the first floor of the building is calculated as described above, and the floor area for the second floor of the building is the amount of square footage contained within the outer building walls and determined by multiplying the dimensions of the length times the width of the building at the second floor. Open structures without walls, such as, but not limited to, open porches (screened or not), carports, gazebos, etc., shall be calculated as one half (1/2) of their area as arrived at by the method above. E. The term “Main (principal) Building” shall be defined as the building situated nearest the front property line and the use of which conforms to the primary use of the property. F. The term “Accessory Building” shall be a building or structure on a lot or parcel subordinate to and not forming an integral part of the main building but pertaining to the use of the main building. G. The term “Finish Grade” shall mean the highest elevation of the sidewalk at the property line or in the absence of sidewalks, the crown of the road closest to the property line as fixed by the County. H. The term “Grade” shall mean the average elevation of the ground, paved or unpaved, adjoining the structure, at the center of each exterior wall line.
Sub-Bidding
Municipal
$11,060.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2026
March 5, 2026
6828 NW 18th Ave, Miami, FL
Related To This Project
Miami, FL
Bid Date: Mar 24 2026
Miami, FL
--
Miami, FL
Bid Date: Mar 17 2026
Miami, FL
Bid Date: Mar 04 2026
Miami, FL
--
Miami, FL
Bid Date: Mar 12 2026
Miami, FL
Bid Date: Feb 18 2026
Miami, FL
Bid Date: Mar 18 2026
Miami, FL
Bid Date: Feb 17 2026
Miami, FL
Bid Date: Mar 06 2026
Miami, FL
Bid Date: Mar 20 2026
Miami, FL
Bid Date: Mar 13 2026
Miami, FL
Bid Date: Mar 03 2026
Miami, FL
Bid Date: Mar 06 2026
Miami, FL
Bid Date: Apr 14 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
