BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated March 13, 2026

Demolition, site work, paving, new construction and renovation of a mixed-use development in West Palm Beach, Florida. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; for site work for a municipal facility; for paving for a road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for the renovation of a municipal facility.

Wharton-Smith, Inc., together with Messam Construction and Kirchman Construction Co. proudly serves as the Construction Manager for Palm Beach County and is soliciting proposals from prequalified subcontractors for GMP 2 of the Palm Beach County Animal Care and Control Facility Renewal/Replacement project. This project consists of approximately 42,460 renovated square feet, 66,336 new unconditioned and conditioned square feet, and 14.05 acres will be completed in five total sequences. Sequence 0 has been awarded and already commenced. Sequences 1 through 4 is the subject of this solicitation, consisting of selective building demolition, concrete, masonry, steel and miscellaneous metals, millwork/casework, FRP, roofing, waterproofing, sealants, doors & hardware, FRP doors, glass & glazing, ICU and critical care unit entrances, drywall, acoustical, stucco/plastering, flooring, sound-absorbing wall units, painting, specialties, signage, canopies & walkway covers, animal care equipment, laundry equipment, foodservice equipment, metal casework & countertops, radiation protection, elevators, fire suppression, plumbing, HVAC (including chilled water services), integrated automation, electrical, communications, safety & security, earthwork, paving, markings, signage & curbwork, flatwork, synthetic grass, fencing, landscape & irrigation, and utilities. Question Deadline 03/03/2026 at 5:00 PM ET Please submit RFI's to comest@whartonsmith.com. We anticipate a June 2026 Notice to Proceed to facilitate a July 2026 mobilization. Work will be performed on an occupied campus and will meet a September 2029 final completion. Do not contact the Architect or Owner for information on this project. Small and local subcontractors actively registered with Palm Beach County's EBO office are encouraged to participate. The EBO goal for this project is 20%. Payment & Performance Bonds will be required for all building envelope scopes of work and subcontracts valued at $100,000.00 or greater.

Post-Bid

Municipal

$35,000,000.00

Public - County

Demolition, New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
4
Bidding Soon
1,230
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

June 1, 2026

Project location map

7100 Belvedere Road, West Palm Beach, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.