BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work and paving for a mixed-use development in Springfield, Oregon. Completed plans call for site work for a sidewalk / parking lot; road / highway; and water / sewer project.

The project will include full pavement repair and surface restoration between Centennial Boulevard and Tamarack Street. Wastewater system repairs will be carried out within the project limits as necessary to support long-term roadway performance. New sidewalks will be constructed where gaps currently exist, and existing sidewalks will be repaired as needed. Pedestrian curb ramps will be upgraded to meet current Americans with Disabilities Act (ADA) requirements. The project will preserve the roadway, improve underground infrastructure, and provide continuous sidewalk access in front of Centennial Elementary School. Instructions to bidders specify that bid documents are available online, and all questions should be directed to the specified Contracts Analyst. Bids must comply with state prevailing wage rates, include statements regarding resident bidder status, and include assurances of compliance with relevant state statutes. All contractors must have current, valid certificates of licensure as required. The City may reject any or all bids for non-compliance or in the public interest. Participation from minority, woman-owned, and emerging small businesses is encouraged. Sealed bids will be received at City Hall Development and Public Works until the deadline and opened immediately online.

GC Bidding

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
34
Bidding Soon
299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 12, 2026

Project location map

To be determined, Springfield, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.