BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Buellton, California. Completed plans call for site work for a water / sewer project.

As of March 16, 2026, this project has not yet been awarded. A timeline for award has not yet been established. Installation of conduit via directional drilling and open trench, installation of electrical vault, removal of existing underground facilities, and appropriate traffic control measures required. The work includes mobilization, preparation and implementation of all traffic control necessary for a safe work area, installation of 1-4" electrical conduit by horizontal directional drilling, installation of 1-3" electrical conduit by open trench, installation of a 24"x36"x26" secondary electric underground enclosure, and removal or relocation of known underground facilities in conflict with proposed construction. All work must meet PG&E requirements and standards and be performed to the satisfaction of PG&E and the City Inspector. Restoration of site improvements, such as concrete sidewalks, curb, asphalt, and landscaping, to pre-construction conditions or better is required as needed. Bidders are required to inspect the site and are responsible for understanding the existing conditions and requirements. Bids shall be all inclusive for the completion of the project, including mobilization costs and incidentals. Bid submission must be prepared on the approved forms in conformance with the bid documents, and compliance with wage rates and labor code requirements is mandatory. All contractors and subcontractors must be pre-qualified to work on PG&E projects and registered with the Department of Industrial Relations. Monthly progress payments will be made, with 5% retained as security for completion. Question Deadline 02/16/2026 at 12:00 PM PT There will be NO pre-bid meeting. Questions may be addressed to Craig Ziel at craig.ziel@tetratech.com

Bid Results

Water / Sewer

$102,075.00

Public - City

Site Work

5

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 16, 2026

Project location map

McMurray Rd, Buellton, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.