BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 12, 2026 at 8:00 PM

Updated March 13, 2026

Site work for a water / sewer project in Pompano Beach, Florida. Completed plans call for site work for a water / sewer project.

Road Name: Wastewater Meter Replacement at Pompano Beach Service Plaza Limits: Midpoint Total Roadway Length: 0.000 Miles Contract Days: 60 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 Description: The work specified in this Contract consists of providing all labor, materials, equipment and incidentals necessary to perform a turnkey replacement of one (1) magnetic wastewater flow meter, three (3) existing plug valves and installation of one (1) insertion valve including associated piping and accessories, restraint joints, valve boxes, concrete valve box collar, and piping modifications located at Pompano Beach Service Plaza, Florida's Turnpike Mainline, Milepost 65. The Bidder (Prime Contractor) shall be currently licensed and hold a certification or registration issued by the Florida Construction Industry Licensing Board as a Plumbing Contractor in strict accordance with Chapter 489, Florida Statutes. Prospective bidders who wish to visit the site will need to contact Mr. Eric Feldmeier at (954) 934-1264 or via email eric.feldmeier@dot.state.fl.us for scheduling. Question Deadline 03/03/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 011 - Wastewater Meter Replacement at Pompano Beach Service Plaza Question Deadline 03/07/2026 at 5:00 PM ET

Bid Results

Water / Sewer

$471,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
129
Bidding Soon
2,210
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.