BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a civil project in Suffern, New York. Completed plans call for site work for a water / sewer project.

Reference Number 0000411955 Furnishing and installing a backwash and waste tank pump station panel upgrade at the Water Treatment Plant. Question Acceptance Deadline 02/23/2026 04:00 PM EST Questions are submitted online Yes Bids shall be made on the Proposal Forms furnished with the Contract Documents and must be accompanied by a Bid Bond acceptable to the Village of Suffern, or a certified cashier's check drawn on a solvent bank in the amount of not less than 5% of the total amount of the Bid. Checks shall be made payable to the Village of Suffern, New York, and are to be held by the Village as a guarantee for the proper execution and delivery of the Contract and Letter of Credit to secure the faithful performance thereof. In default of such execution and delivery of Contract and Letter of Credit with the above requirements within ten (10) days after the proposal shall have been accepted, the amount of the deposit represented by the check or bid bond shall be forfeited to and retained by the Village of Suffern as liquidated damages. The Board of Trustees reserves the right to select the bid, the acceptance of which in their judgment will best serve the efficient performance and guaranteed completion of the work and to reject any and all bid presented, or to award the contract to other then the low bidder if, in the opinion of the Board, the best interest of the Village may be served thereby, or to accept the whole or any part of a bid or proposal as the same may be modified by mutual consent. The Contractor shall shop fabricate a Programmable Logic Controller (PLC) panel and shall have the following functions: o PLC based System will accept signals from 4 float switches from each tank. o Waste water pumps will start at lead float and stop at low float. In case water rises above lag or high alarm floats, a lag pump will be started. Both pumps will shut off at low (off) float. o Back wash tank pumps will start at lead float and stop at low float. In case water rises above lag float, a lag pump will be started. Both pumps will shut off a low (off) float. In case a high-water float in the wastewater tank is reached, both pumps will be shut down. Operation will resume when low float at the water tank is deactivated.

Award

Water / Sewer

$106,064.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,168
Active Projects
610
Bidding Soon
8,348
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

26 Pat Malone Dr, Suffern, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.