BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2026 at 7:00 PM

Updated February 25, 2026

Site work and paving for a road / highway in Union, Illinois. Completed plans call for site work for a road / highway.

Sealed proposals are requested for improvements including construction of micro-surfacing over 3.12 miles of East Coral Road from Northrup east to Seemann Road using non-MFT funds. Proposals must be submitted on forms from Coral Township, available at the highway department office. For another improvement, bituminous pavement work is required, specifically: 552 tons of Hot Mix Asphalt Surface Course: Mix C N50, 5908 pounds tack (Prime Coat), and 70 square yards of HMA Surface removal (Butt Joint). Proposals must also be submitted on township-furnished forms. All labor must be compensated at not less than the prevailing wage rates as established by McHenry County or the Department of Labor, in accordance with the special provisions of the specifications. Each proposal must include a proposal guarantee of not less than 5 percent of the bid or as specified in the special provisions. Coral Township reserves the right to reject any or all proposals and waive technicalities.

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
8
Bidding Soon
2,680
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

April 9, 2026

Project location map

To be determined, Union, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.