Published March 21, 2026 at 8:00 PM

Updated March 22, 2026

Site work for a playground / park / athletic field in Willow Street, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

The work generally includes electrical service and site lighting associated with the new parking area, playground, walking trail, and basketball court. The project is being constructed at the same time as the park and playground, and the contractor must coordinate their work with other projects underway on site, including separate contracts for the general contractor/construction of the park, development of the playground, and anticipated pad and pavilion construction within the park. Moore Engineering is serving as the Electrical Engineer for the project. Bids must cover all costs for the completion of this project as set forth in the Project Manual. Bid security in an amount not less than 10% of the amount of the bid will be required, and all bids will remain irrevocable for 60 days after the actual date of bid opening. Bidders must comply with State anti-kickback regulations, submit an executed anti-collusion statement, and comply with the Pennsylvania Prevailing Wage Act (Act No. 442 - Session of 1961) since the contract is estimated to cost more than $25,000.00. A Performance Bond and Payment Bond, each in an amount equal to 100% of the contract and each with satisfactory corporate surety, will be required to be furnished by the successful bidder at the time stated in the specifications. West Lampeter Township reserves the right to waive any defects, errors, omissions, or informalities in bids received, to reject any and/or all bids submitted, and to accept any bid which it may deem to be in the best interests of the Township. Willow Street Park is a public site and remains open to the public. Bidders may visit the site at their convenience; no appointment is necessary. Please be advised that the West Lampeter Township Public Works crew has begun performing selective site demolition and preparation work. Bidders are asked to use caution, exercise good judgment, and prioritize safety while visiting the site Questions Due Date: Mar 5th 2026, 5:00 PM EST Project generally comprises demolition of roadway pavement and curbing in preparation for roadway widening; widening and installation of curb and sidewalk within Township right-of-way; installation of parking facilities, bituminous trail system, natural stone trail system, basketball court, fencing, and site furnishings; installation of water and sewer service; installation of storm water management facilities; coordination of installation of playground equipment, shade structure and other site amenities; and finish grading, seeding and landscaping for the proposed Park.

Bid Results

Playgrounds / Parks / Athletic Fields

$123,975.00

Public - County

Site Work

4

26

146

4

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
729
Active Projects
325
Bidding Soon
3,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

April 13, 2026

Project location map

9 Main St, Willow Street, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.