Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 19, 2026

Site work and outdoor lighting for a mixed-use development in Beverly Hills, Michigan. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and sidewalk / parking lot.

As of May 07, 2026 project was awarded to Jason's Outdoor Services, awarded amount is $121,468.50 Reference Number 0000412397 The Village of Beverly Hills is seeking competitive bids to complete a landscape improvement project at Riverside Park. The project consists of adding and grading soils, installing a stone pathway, solar bollard lighting, a boulder bordered kayak launch, concrete pads with benches and trash receptacles, and the planting of perennial wildflowers, ornamental grasses, trees and grass seed. It is highly recommended site visits are made before bid submittal. Riverside Park is located on the south side of Riverside Drive, 500 feet east of Evergreen Road. Question Deadline 03/04/2026 at 4:00 PM ET Questions are submitted online No Any questions or site visit requests should be submitted to Neil Johnston, via email njohnston@beverlyhillsmi.gov The Village of Beverly Hills reserves the right to reject any or all bids or portions thereof for any reason. No bid may be withdrawn for at least 30 days after scheduled closing time for receipt of bids. The cost of preparing and submitting a proposal is the responsibility of the firm and shall not be chargeable in any manner to the Village. The Contractor shall provide all labor, equipment, materials, permits, and incidentals necessary to complete the work as specified Riverside Park is located on the south side of Riverside Drive, 500 feet east of Evergreen Road Perform clearing, grubbing, and removal of debris as needed Excavate and grade to establish proper elevations for pathways, concrete pads, planting beds, and kayak launch area. Ensure positive drainage away from structures, pathways, and activity areas. Import or export soil as necessary to meet design grades. All earthwork shall conform to MDOT standards for compaction and surface preparation.

Award

Playgrounds / Parks / Athletic Fields

$121,469.00

Public - City

Outdoor Lighting, Site Work

3

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
183
Bidding Soon
2,501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

April 10, 2026

Project location map

Riverside Dr, Beverly Hills, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed