BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Laval, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20121802 Deadline for receipt of complaints 2026-02-23 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 4 Start date of work: 1 May 2026 End date of work (acceptance with reservation): 21 August 2026 End date of work (acceptance without reservation): 20 September 2026 Only contractors who hold the required licence under the Building Act and are members of the CCQ will be considered for the contract. Bidding contractors are responsible for the selection of subcontractors, both in terms of their solvency and the content of their bids. A non-mandatory site visit, in the presence of professionals, is scheduled as follows: A site visit is scheduled for 16 February 2026 at 10:00 a.m. at the meeting point located at 145 Alexandre Street, Laval, QC, H7G 3L3. Tender guarantee (type and amount): 10% of the total tender amount excluding all applicable taxes, in the form of a surety bond issued by a financial institution. Performance bond: . Performance bond equal to 50% of the contract amount in the form of a surety bond issued by a financial institution. . Bond for labour and materials equal to 50% of the contract amount in the form of a surety bond issued by a financial institution.

Award

Educational

$1,148,950.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
694
Active Projects
450
Bidding Soon
4,012
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 1, 2026

Project location map

145 Rue Alexandre, Laval, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.