BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 11, 2026

Site work and paving for a road / highway in Constance Lake, Ontario. Conceptual plans call for site work for a road / highway.

Construction of a single-circuit 230-kilovolt (kV) transmission line that will be designed to accommodate a future second circuit. It includes a transformer station near Geraldton and two future switching stations near Nipigon Bay and Aroland First Nation. The project is located in the traditional territories of the Anishinaabe, signatory to the Robinson Superior Treaty (1850) and James Bay Treaty (Treaty No.9), and traverses Métis Nation of Ontario Region 2, home to the Northern Lake Superior Métis community. TIMELINE: Notice of Commencement and community open house 1 took place in June, 2026. The project will follow the Class Environmental Assessment (EA) for Transmission Facilities. Preferred route announcement and community open house 2 is anticipated in spring, 2027. Draft Environmental Assessment study report is expected to be available for a 30-day public comment period in summer, 2027. Completion of EA is anticipated in fall, 2027. Detailed design is scheduled for completion in 2028. Construction is expected to start in 2029 and be in service in 2032. Note: Hydro One, in partnership with Waaskoneh Yaabik, a consortium of seven First Nations, works on the project. Through Hydro One's industry-leading First Nation 50-50 Equity Partnership Model, proximate First Nations will have the opportunity to invest in a 50 per cent equity stake in the transmission line component of the project. Together, Hydro One and the proximate First Nations will collaborate on the planning, development and construction of the transmission line.

Conceptual

$70,000,000.00

Public - Federal

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
25
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2029

Project location map

Multiple Locations, Constance Lake, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.