Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Renovation of a municipal facility in Waukesha, Wisconsin. Completed plans call for the renovation of a municipal facility.

No. 14 - Work on this project will require HVAC contractors. No. 15 - The Contractor shall coordinate the removal and disposal of the existing boiler and circulation pumps and pump housings and furnish and install a new high efficiency boiler and pumps and pump housings, rework existing gas, electrical, exhaust/intake piping and control wiring as required for a fully functional system. The Transit Center only has one boiler; the contractor shall remove and replace the boiler and pumps during the cooling season to avoid the interruption of normal building operation. The Contractor shall remove heating capabilities when weather conditions allow them to do so without negatively affecting occupant comfort. Upon removal of heating capabilities, the Contractor will be responsible for providing temporary heat to meet building demand for normal operation conditions, at the Contractor's cost, should it be required. No. 16 - All debris must be removed from the building daily. The Contractor will be permitted to place a dumpster on site for the sole purpose of disposal of debris related to this project. No. 17 - Unit Bid Item, "REMOVE AND REPLACE EXISTING BOILER" the Contractor shall properly disconnect all wiring, gas, exhaust/intake, and hot water lines prior to removing the boiler. Once the boiler has been properly and safely disconnected, the Contractor shall remove the boiler from the building for disposal. Remove and dispose of existing boiler, circulation pumps and housings Provide and Install new boiler, circulation pumps and housings This project is expected to be funded by the Federal Transit Administration (FTA) as authorized under 49 U.S.C. 5307, 5337 and/or 5339. This notification of federal participation will be included in each subcontract financed in whole or in part with federal assistance provided by FTA.

Award

Municipal

$52,400.00

Public - City

Renovation

8

6

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
155
Bidding Soon
2,982
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

April 6, 2026

Project location map

212 E Saint Paul Ave, Waukesha, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed