BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Hopkinton, Massachusetts. Completed plans call for site work for a water / sewer project.

The project is for the Claflin Place Drainage Improvement, where bids are invited from qualified contractors for drainage improvements. MassDOT prequalification in Highway - Construction is required for an estimated project value of $248,300. Bids must be sealed and submitted to the specified location, and bidders are responsible for checking the procurement website for addenda. Minimum wage rates (prevailing wage) and OSHA compliance are required. A bid bond, cash, or check equal to at least 5% of the proposed work value is required. A Labor & Materials Payment Bond for 50% of the proposed work value is also required, but no performance bond is required. Evidence of insurance coverage is required at the time of the award. Bids will be awarded to the lowest responsible and responsive bidder. The Town reserves the right to reject any or all bids, limit the extent of work to keep within available funds, and accept the bid deemed in the Town's best interest. The Town is an equal opportunity/affirmative action employer. Instructions to bidders include submission deadlines, required prequalification, and bond/insurance requirements. Questions regarding this contract shall be submitted in writing to the Procurement Manager, Ritika Patel at rpatel@hopkintonmma.gov . Questions shall be submitted by Feb 27, 2026 at 2 PM to be considered. There will be no pre-bid meeting for this project. The Town of Hopkinton Department of Public Works is seeking bids from qualified Contractors for the Drainage Improvement Project on Claflin. There will be no pre-bid meeting for this project. Performance Bond: None Evidence of Insurance Coverage: Required at time of award MassDOT prequalification of contractors with the class of work as, Highway - Construction, for the project with an estimated value of $248,300 will be required. Silt sacks shall be installed in retained existing and proposed catch basins and drop inlets within the project limits and as required by the Town or Resident Engineer. The silt sack shall be as manufactured to fit the opening of the drainage structure under regular flow conditions, and shall be mounted under the grate. The insert shall be secured from the surface such that the grate can be removed without the insert discharging into the structure. The filter material shall be installed and maintained in accordance with the manufacturer's written literature and as directed by the Town or Engineer

Award

Water / Sewer

$164,200.00

Public - City

Site Work

10

4

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
841
Active Projects
467
Bidding Soon
5,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

April 13, 2026

Project location map

Claflin Pl, Hopkinton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.