BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving, outdoor lighting and renovation of a mixed-use development in Windham, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for the renovation of a water / sewer project.

Summary of Work includes but is not limited to the following: Demolition and removal of the following items: three 20,000-gallon #2 fuel oil USTs, a 4,000-gallon gasoline UST, a 2,500-gallon diesel UST and associated fuel lines and fuel pump station. Removal of an existing generator in the building along with the pump sets/piping both on 1st and 2nd floors. Installation of new 8,000-gallon dual compartment AST (4,000-gallon gas /4,000-gallon diesel gasoline split) with fuel pump dispenser and new fuel management system. Installation of a new 300KW generator with 500-gallon belly tank outside of building on concrete pad with a solid wood fence. Electrical switch gear and associated improvements for the new generator and the replacement of existing metal louvres in the generator room with store front windows. Backfill for tank excavations and restoration for pavement, pavement markings, curbing, concrete sidewalks, creation of planting islands and increased green space, and site lighting. Question Deadline 02/17/2026 at 3:00 PM ET Deadline to submit Questions electronically No interpretations of the meaning of the plans, specifications or other contract documents will be made orally to any bidder. Every request for such interpretation should be in writing to the awarding authority and, to be given consideration, must be received at least ten (10) days prior to the date fixed for the opening of bids Construction Start: On or before May 1st, 2026 Substantial Completion: Shall be completed by August 1st, 2026 Construction Duration: Construction Duration shall be 90 calendar days. Note that in the event of university closing or early dismissal due to inclement weather this BID will be due and opened at 2:00 PM on the next business day. Please visit the University's website at https://www.easternct.edu for up to date closing information.

Award

Water / Sewer

$1,749,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Renovation, Site Work

28

28

98

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

May 1, 2026

Project location map

83 Windham St, Windham, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.