BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Site work for a pipeline in Woodworth, Louisiana. Completed plans call for site work for a pipeline.

The work includes installation of 4 and 2 inch diameter PE gas mains and services for the area of Robinson Bridge Road, LA. HWY. 470, and Chickamaw Road, including natural gas service transfers and odorization system replacement. The project is funded by a federal grant from the U.S. Department of Transportation Pipeline and Hazardous Material Safety Administration (PHMSA) under the Natural Gas Distribution Infrastructure Safety and Modernization Grant Program. All iron, steel, manufactured products, and construction materials used must be produced in the United States as outlined in 2CFR Part 184 and related federal guidance. Compliance with Build America, Buy America (BABA) requirements is mandatory, with contractors required to provide documentation demonstrating compliance. The project must follow the Federal Labor Standards Act regarding basic hourly rates and bona fide fringe benefits under the Davis-Bacon Act. Contractors must have an ongoing Drug and Alcohol Mis-use Program per PHMSA regulations, use qualified and certified workmen for welding or heat fusion operations to meet specified requirements, and maintain an Operator Qualification Program for employees performing covered tasks on natural gas pipeline systems. Qualifications may be provided by third-party testing agencies if they meet or exceed the Owner's established standards. The Owner reserves the right to reject any or all bids for just cause. Each bidder must provide bid security of at least five percent of the total bid price. The successful bidder must furnish Performance and Payment Bonds equal to 100% of the contract amount, have an active Unique Entity ID (UEI), and be registered with the Federal System of Award (SAM) Registration Program prior to award. The work is generally described as follows: Installation of 4 and 2 diameter PE gas mains and services serving the area of Robinson Bridge Road, LA. HWY. 470, and Chickamaw Road; including natural gas service transfers and odorization system replacement. Question Deadline 03/02/2026 All questions about the meaning or intent of the Contract Documents are to be directed to the ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered.

Bid Results

Pipeline

$1,433,788.00

Public - City

Site Work

42

21

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

April 13, 2026

Project location map

Multiple Locations, Woodworth, LA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.